Khaur Oil & Gas Battery, Pakistan Oilfield Limited

Client:

Pakistan Oilfield Limited

Contractor:

PREFAB Services PVT, LTD

Duration:

2 Months

Total Cost of Project :

3.5 Million

Project Discription:

Fabrication & Erection of Pipe Racks. Fabrication & Assembly of field Piping Spools. Re-assembly of Interconnecting piping shipped from Canada. Assembly of Cable Trays. Hydrotesting of Field Fabricated Piping. Layout of E&I Cables from modules to MCC Building and terminate same in MCC. Cleaning, painting and insulation of field erected equipment. Participate in Commissioning and Start-up. Clean-up the Site.