Khaur Oil & Gas Battery, Pakistan Oilfield Limited
Client:
Pakistan Oilfield Limited
Contractor:
PREFAB Services PVT, LTD
Duration:
2 Months
Total Cost of Project :
3.5 Million
Project Discription:
Fabrication & Erection of Pipe Racks. Fabrication & Assembly of field Piping Spools. Re-assembly of Interconnecting piping shipped from Canada. Assembly of Cable Trays. Hydrotesting of Field Fabricated Piping. Layout of E&I Cables from modules to MCC Building and terminate same in MCC. Cleaning, painting and insulation of field erected equipment. Participate in Commissioning and Start-up. Clean-up the Site.